Class Solution
- java.lang.Object
-
- g0801_0900.s0826_most_profit_assigning_work.Solution
-
public class Solution extends Object
826 - Most Profit Assigning Work.Medium
You have
njobs andmworkers. You are given three arrays:difficulty,profit, andworkerwhere:difficulty[i]andprofit[i]are the difficulty and the profit of theithjob, andworker[j]is the ability ofjthworker (i.e., thejthworker can only complete a job with difficulty at mostworker[j]).
Every worker can be assigned at most one job , but one job can be completed multiple times.
- For example, if three workers attempt the same job that pays
$1, then the total profit will be$3. If a worker cannot complete any job, their profit is$0.
Return the maximum profit we can achieve after assigning the workers to the jobs.
Example 1:
Input: difficulty = [2,4,6,8,10], profit = [10,20,30,40,50], worker = [4,5,6,7]
Output: 100
Explanation: Workers are assigned jobs of difficulty [4,4,6,6] and they get a profit of [20,20,30,30] separately.
Example 2:
Input: difficulty = [85,47,57], profit = [24,66,99], worker = [40,25,25]
Output: 0
Constraints:
n == difficulty.lengthn == profit.lengthm == worker.length1 <= n, m <= 1041 <= difficulty[i], profit[i], worker[i] <= 105
-
-
Constructor Summary
Constructors Constructor Description Solution()
-
Method Summary
All Methods Instance Methods Concrete Methods Modifier and Type Method Description intmaxProfitAssignment(int[] difficulty, int[] profit, int[] worker)
-